Showing posts with label Get It Done. Show all posts
Showing posts with label Get It Done. Show all posts

Tuesday, October 1, 2013

Get 'R Done October 2013

My list last month was light.
 Quilt Carpenter's Star - Not Done
Doug's Quilt - Not Done, Close

I was getting ready to work on Doug's quilt and found that the back was smaller than the top.  I had to order fabric to get it done.  Well with the thanks of Bonnie's Quilt Cam last night, I was able to get three borders on the back and the fourth is cut and ready to go.  That is getting done this morning.


I'm not showing this again until I have a finished bound quilt ready to give to my son.

October's Get 'R Done list:

Quilt Carpenter's Star
Finish Doug's quilt, enlarge backing, quilt, bind

If there is any time left, I will work on

Sew applique on Arin's quilt borders.


Please join me in seeing what other quilters are doing.  This post is being linked to Judy's Get 'R Done

Saturday, September 28, 2013

Arin's Quilt

The quilt that I have been enamored with from Fon's and Porter is going to my sis.  She's so excited to be receiving it.  She'll have to pick it up when she comes stateside next summer.

Today, I'm working on the border but without the border fabric.  It's on order.  But I am preparing my applique for the border.

This is an alternate border design in the magazine for the border.  I love it and my batiks will look great in the shapes.
I really need to be working on quilting my son's quilt.  I found the backing wasn't large enough for the top.  The fabric was ordered and received.  I have no excuses.  Today, I will add the extra to the back and I have decided, after watching Eleanor Burns that the quilting will be only a single embroidery design placed strategically around the quilt.  I've decided which design I want to use already.  701.  That's so I won't forget or in case my post it gets lost.

I was looking for a picture and couldn't find one.  So I took on of the top and back.

Back

Top

Today is GET 'R DONE

Have a great day everyone.

Monday, September 16, 2013

My Design Wall 9-16-2013

My design wall last night.  I didn't have any more time to sew blocks into rows.  One row of blocks is on my sewing machine ready to go.  The top half are all sewn together.  Looks like I have three rows to go.  I did spend some time online purchasing some ric-rack for the vines.  I'm going to have a border with applique flowers, birds and butterflies.  Just like in the magazine.  No imagination.  Well, it will look great and I don't want to make the body any larger.


I thought I might work on my son's jean quilt and found out I didn't make the back large enough and I used the leftover of it on another quilt.  So I ordered more fabric for enlarging the back.  

This post is linked to Judy's Design Wall.  See what others have been doing.

Tuesday, September 3, 2013

Get 'R Done September


September already?  My Get 'R Done August list I knew would be sketchy.  I got one quilt quilted.  That's all.  I had a lot of company and was out of town some of it.

This is Tina's first quilt.  I quilted leaves or hearts on it.  She will be using it as a lap quilt for her couch.






September's list will be August's list of tying my son's jean quilt and quilting my Carpenter's Star quilt.

This post is being linked to Judy's Get it Done Challenge

Wednesday, July 31, 2013

Get 'er Done - August 2013

Get 'er Done for August will be skimpy this month.  I am on vacation in Montana and will be on vacation into the second week of August when my daughter and grandkids will be in Oregon with me the following week.

I am going to attempt to quilt my friend's jean quilt so it can travel back with my daughter.

Tie my son's jean and crown royal quilt.

And if time allows, I want to quilt my Carpenter's Star.

This post is being linked to Judy's Patchwork Quilting  Check the link out to see what others are doing.

I don't have any pictues of the tops this week so here's a beautiful butterfly I photographed on my patio a while back.

Have a great day!

Monday, July 1, 2013

Get 'er Done May, June and July 2013

Jana's quilt is finished




Doug's jean and crown royal quilt is ready for tying.

Jessee's quilt is finished.



Dani's quilt is finished,  This was a UFO last year and I decided to finished and give it to my youngest granddaughter.  The 3 will be getting them this summer when I go to Montana for vacation.

 My list for July will be short because of all the company I will be having.

Finished binding Arin's Twirling Star Tablerunner.

Maybe quilt my Carpenter's Star.

Don't forget to go to Judy's Get 'er Done post and see what everyone else has done.

Monday, January 21, 2013

Design Wall 1/21/2013

Not much going on on My Design Wall.  These are Crown Royal Bags that will be the quilt back of my son's Jean Quilt.  I have several of them taken apart but aren't ready for sewing into rows yet.  The pattern is laying by the side of the bags.  The white space will be made out of purple flannel.  I hope to get some of the blocks trimmed and sewed together.



What's on your design wall.  To see other design walls go to Judy's blog

Monday, December 31, 2012

Get 'Er Done January 2013


Judy from Patchwork quilts has changed the name and concept of the UFO project.  Now it will be Get It Done.


Four items I would like to get done in January are:

1.  Bind Jessee's quilt

2.  Finish Doug's quilt back for his Jean/Crown Royal quilt.



3.  Finish binding tablerunner


4.  Jana's quilt needs to be quilted, bound and labelled


This post is being linked to Judy's Get It Done